GIOPATO & COOMBES MAEHWA CHANDELIER ARMATURE 41 L50" x D45.5"x H14.5"

GIOPATO & COOMBES

MAEHWA CHANDELIER ARMATURE 41

In the Korean language, maehwa is plum blossom. It’s a delicate word, revealing the unexpected gift of wonder. Each sphere embraces the light source, supported by a cable that flexes slightly, like a pistil protected by a corolla not bloomed yet.
Dimensions

L50" x D45.5"x H14.5"
19.8 lbs

21" − 39" drop height range
Ø11.8" × H2" canopy matching metal finish

Materials

handblown borosilicate glass, handmade finish electroplated brass

glass options:
transparent (clear)
opal white mix (21 blushed white + 10 translucent)
pale pink mix (21 blushed pink + 20 translucent)
smokey grey mix (21 blushed grey + 20 translucent)

finishes:
brushed brass
brushed nickel

please refer to the "downloads" for finish options and technical sheets

Details

ILLUMINATION
110-120V 50-60Hz
LIGHT SOURCE (INCLUDED)
41 Proprietary Maehwa LEDs.
40.2 W, 4920 lm, 2700K warm white. CRI>95.

driver options:
Phasecut
0-10 Volt
Switch / Push
DALI

Lead Time

10 - 12 weeks approximately

garde logo

GIOPATO & COOMBES

MAEHWA CHANDELIER ARMATURE 41

In the Korean language, maehwa is plum blossom. It’s a delicate word, revealing the unexpected gift of wonder. Each sphere embraces the light source, supported by a cable that flexes slightly, like a pistil protected by a corolla not bloomed yet.

Dimensions

L50" x D45.5"x H14.5"
19.8 lbs

21" − 39" drop height range
Ø11.8" × H2" canopy matching metal finish

Materials

handblown borosilicate glass, handmade finish electroplated brass

glass options:
transparent (clear)
opal white mix (21 blushed white + 10 translucent)
pale pink mix (21 blushed pink + 20 translucent)
smokey grey mix (21 blushed grey + 20 translucent)

finishes:
brushed brass
brushed nickel

please refer to the "downloads" for finish options and technical sheets

Details

ILLUMINATION
110-120V 50-60Hz
LIGHT SOURCE (INCLUDED)
41 Proprietary Maehwa LEDs.
40.2 W, 4920 lm, 2700K warm white. CRI>95.

driver options:
Phasecut
0-10 Volt
Switch / Push
DALI

Lead Time

10 - 12 weeks approximately

Flag of Italy
Italy

Inquiries